Skatepark Project
Skatepark project slideshow_slide 1
Skatepark project slideshow_slide 2
Skatepark project slideshow_slide 3
Skatepark project slideshow_slide 4
Let's Get the Wheels Rollin'

The Skatepark Committee, along with the GF Parks & Rec Foundation, teamed up to raise the funds needed to update and relocate our local Skatepark to Kannowski Park. Through the generous pledged donations of our community, Phase 1 of a relocated, updated Skatepark opened in September 2018. Rydell Skatepark will provide skaters of all ages and their families a safe place to gather.

We are currently working to complete the skatepark project by raising the funds needed to build Phase 2 of Rydell Skatepark. Help us make this a reality by getting involved in and donating to the Skatepark Project fundraising campaign. Naming opportunities for skatepark features are still available as well as places in the “Friends of the Park” and “Skater Friends” donation gift clubs.

Get involved on social media: #SkateparkGF

Relocated Concrete Features
  • Tri-Tiered Manual Pad
  • Grind Ledge 10’ x 2’ x 1’10”H
  • HSS Grind Rail
New Features
  • 3’0’’ H Bank Ramp
  • 2‘6’’ Quarter Pipe
  • Radius Bowl Wall with Galvanized Steel Pipe Coping
  • Waterfall
  • Drain
  • Table Top
  • Pool Coping
  • Quarter Pipe, Variable Heights
  • Spine
  • 2‘5’’ Quarter Pipe
  • 5’6’’ Cantilevered Radius Wedge Extension
  • Stairs
  • Single Kinked Grind Rail
  • 2’6’’ Cantilevered Quarter Pipe
  • 2’6’’ Volcano Transition
  • 2’0” Bank to Bank
  • Grind Ledges, Variable Heights
  • 1’8” Double Raked Manual Pad
Naming Opportunities
  • Naming Right (Park)                   SOLD – Rydell
  • Phase 1 Bowl                             $50,000
  • Tri-Tiered Manual Pad                $5,000
  • Grind Ledge                                $5,000
  • HSS Grind Rail                           $5,000
  • 3’0″ H Bank Ramp                      SOLD – Blackpoint Building Group
  • 3’6″ Quarter Pipe                        SOLD – JerBear Ramp
  • Table Top                                    SOLD – Rhombus Guys
  • Quarter Pipe                               $5,000
  • Spine                                          SOLD – JerBear Ramp
  • 2’6″ Quarter Pipe                        SOLD – JerBear Ramp
  • 5’0″ Cantilevered Radio Wedge $5,000
  • Stairs                                          $5,000
  • Single Kinked Grind Rail             SOLD – Blackpoint Building Group
  • 2’6″ Cantilevered Quarter Pipe   $5,000
  • 2’6″ Volcano Transition               SOLD – SEND HELP Skateboards
  • 2’0″ Back to Back                       $5,000
  • Grind Ledges, Variable Heights  $5,000-10,000
  • 1’8″ Double Raked Manual Pad  $5,000
  • Park Bench                                 $1,500
  • Park Table                                   $1,500
Donor Gift Clubs
  • Friends of the Park                 $500 – $1,000
  • Skaters Friends                      $200 – $499
new skatepark project web logo
Contact Information

New Skatepark Project
Committee
Email

Additional Info
Interested in Helping?
Donate Today